Survey-Ready Templates for Superyachts
MARPOL, ISM, and environmental compliance documentation for vessels 400GT+. Built to pass flag state audit and port state control inspection first time.
What documents does your vessel need?
Enter your vessel details and we'll calculate your compliance requirements based on current IMO conventions and flag state codes.
See your full compliance checklist
Enter your email to unlock all required documents and get a summary you can share with your management company.
No spam. Unsubscribe anytime.
Recommended (Best Practice)
Regulatory Advisories
This tool provides general guidance based on IMO conventions and common flag state requirements as of April 2026. It does not constitute legal advice. Always verify requirements with your flag state administration and classification society. Actual requirements may vary based on vessel-specific factors.
Why templates, not consultants
Consultancy engagements are expensive
Outsourcing compliance documentation to a maritime consultancy costs thousands per document set. Our templates give you the same survey-ready structure at a fraction of the cost.
Writing from scratch takes weeks
Our templates are ready to customise. Most vessels complete their documentation in days, not weeks. Built from real survey experience.
A PSC deficiency costs more than documentation
Detentions, delays, and remedial surveys add up fast. Survey-ready documentation is the cheapest insurance your vessel can carry.
Download. Customise. Pass Survey.
Professional templates from €149 that you can make vessel-specific in a day, not weeks.
Choose your templates
14 templates covering MARPOL, ISM Code, ISPS, environmental, SOLAS & STCW, and MLC requirements. Each includes a companion guide, quick reference card, and implementation checklist.
Make them vessel-specific
Word & Excel formats. The companion guide tells you exactly what to insert, where, and why — written for the officer completing the document, not a shore-based administrator.
Present with confidence
Document structures designed to meet the requirements of the Red Ensign Group, Marshall Islands, Malta, and Bahamas flag states. Built for what surveyors actually check.
Every template includes more than the document
Main Template
Word/Excel format, fully editable, regulation-compliant structure.
Companion Guide
Explains what to insert, where, and why, section by section.
Quick Reference Card
One-page summary for bridge or engine room display.
Free Updates
When regulations change, you get the revised template at no cost.
Documentation by Regulation
14 professional templates organised by the international convention or code they fall under.
MARPOL
Annexes I–VI · 4 templates · from €149
SOPEP, Garbage Management, Sewage Management, and SEEMP documentation.
ISM Code
IMO Res. A.741(18) · 3 templates · from €149
SMS manuals, Mini-ISM for sub-500GT, and risk assessment documentation.
Environmental
MEPC.378(80) & EU 1257/2013 · 2 products · from €149
Biofouling management and the IHM Management System for vessel lifecycle compliance.
ISPS Code
SOLAS Chapter XI-2 · 1 template · €249
Ship Security Plan with threat assessments and security level procedures.
SOLAS & STCW
SOLAS, STCW & LOLER · 3 templates · from €99
Standing orders, lifting gear registers, and mooring lines management.
MLC & Flag State
MLC 2006 · 1 template · €149
Fresh water management and legionella prevention documentation.
Built for yacht professionals
Every template is structured exactly how flag state surveyors and PSC inspectors expect to see it. Written by a Chief Engineer, not a desk-based consultant.
Survey-proven structure
Document structures based on what surveyors from Lloyd's Register, Bureau Veritas, and RINA actually check during flag state and class surveys.
Written for the officer completing it
Companion guides explain what to insert, where, and why. Written for the Chief Officer or Engineer doing the work, not a shore-based administrator.
Customise in a day, not weeks
Most single templates can be made vessel-specific in a working day. Larger packages like the SMS Essentials may take 2-3 days for full implementation.
Frequently Asked Questions
What format are the templates in?
Will these templates work for my flag state?
How long does customisation take?
Who writes these templates?
When will templates be available?
What happens when regulations change?
Get survey-ready today
14 professional templates covering MARPOL, ISM, ISPS, and environmental compliance. Built from the engine room up.
Word & Excel formats · Fully editable · Flag state ready · Free regulatory updates
Preview All Templates